8/20/14 - Storm sewer repair work that was originally scheduled last Saturday in the City of Brighton has been moved to this weekend. The Cityâs contractor will be making repairs to storm sewer infrastructure this Saturday and the work is expected to get underway around 7am. It involves two storm drains on North Second Street and one on Washington Street. The City says the work will require partial lane closures in those areas and some intermittent traffic inconveniences may occur. (JM)
↧